Development Code for Data Centers

On June 2, 2026, the Statesboro City Council approved Ordinance 2026-01, an amendment to Section 2.4.14 of the Unified Development Code (UDC) establishing new zoning classifications and requirements for Technological Facilities and Data Centers. The ordinance passed 3-1 after a public hearing and months of research, including staff and council visits to existing data center sites in Georgia.

It's important to note: this ordinance does not approve any specific data center project. Instead, it creates the rules and process that would apply to any future proposal.

Why did the City consider this?

City leaders say the ordinance was meant to be proactive rather than reactive — putting clear, vetted rules in place before any project came forward, rather than negotiating standards after the fact. Council members have emphasized that the ordinance itself does not obligate the City to approve any project — each proposal still requires its own Special Use Permit review, public hearing, and council vote. Residents will have the opportunity to weigh in on any specific proposal, just as they did during the development of this ordinance.

Read the full text of Ordinance 2026-01

Frequently Asked Questions

  1. Data centers vary by scale. Many people consider them all massive facilities (i.e., Effingham County) but they can substantially vary in size. The City of Statesboro caps all data center campuses to sites with at most 50 acres. The actual facility square footage is much lower due to the needs for buffers, stormwater, parking, and electrical generation.
  2. Data centers are notoriously connected to AI, but that isn’t actually what all facilities are for. A substantial number of facilities in the US are used for everyday task such as cloud services, banking information and streaming. [i]

 

[i] EPI Center for Scientific Evidence in Public Issues: March 2026 Data Center Article

Georgia Power has received an order from the Public Service Commission to freeze rates through 2028. Georgia Power has also been ordered to ensure that data center revenue provides for downward pressure on residential rates, and that infrastructure upgrades are not born by customers. [i]

 

[i] Public Service Commission Data Center Fact Sheet: March 2026

Noise concerns are legitimate concerns. The inside of a data center can be extremely noisy, sometimes exceeding 100 DbA inside. Cooling fans, generator use and testing all produce sound. Generally, a lack of appropriate sound mitigation, whether it be the lack of regulation or lack of onsite sound prevention causes these issues. There are a number of acoustical solutions to reduce sound produced both inside and outside of data centers, to include sound barriers like attenuation walls around the property line, incorporating natural sound barriers like berms, trees, and shrubs, along with active noise-canceling technology on the equipment itself.[i]

 

[i] https://future-bridge.us/noise-control-in-data-centers-key-design-strategies/

  1. They absolutely can consume significant water, but many facilities are working towards reducing their water impact in a number of ways. Many have moved to the use of closed-loop systems, which act similar to the radiator in a vehicle by recycling water within the system itself. Others are creating their own treatment facilities to reuse water on site. Older evaporative cooling technology can use enormous volumes of water.

  2. The City of Statesboro requires all data centers to hook to municipal sewer and water, preventing individual well impacts after construction.
The City of Statesboro has not offered nor does it intend to offer any tax relief to data center facilities. Developers are responsible for their own site and development improvements unless they serve a direct public purpose.
Even small facilities need the necessary infrastructure to run. In the case of the City of Statesboro, a connection to public utilities is required. Power and fiber infrastructure are also important, and large power lines are normally locations where these can easily be placed.
Home values are normally shaped by schools, jobs, and the economic conditions of an area but, like any bad neighbor, it’s possible. Market research has shown that nationally areas with data centers kept pace with other residential growth in values.[i] An often-used example is Loudoun County, Virginia, which hosts 250+ data centers. Redfin shows that the median home price of housing in Loudoun County was over $800,000, with many homes sold within 45 days on the market.

 

[i] Tract Capital Management, LP: Data Centers and Residential Property Values March 2026

The Federal Reserve Beige Book shows that data center development creates growth in multiple sectors.[i] The reserve banks of Richmond, Cleveland, and Missouri all show that the impact of data centers has led to increases in manufacturing, construction, and distribution fields, while also creating some shortages in the labor market for construction. Loudoun County, Virginia, also shows substantial partnership in Workforce Development by partnering with both George Mason University and Northern Virginia Community College in order to train information technology workers.[ii]In 2023, the total economic output from data centers resulted in $31.4 Billion dollars, with numbers showing that for every job inside a data center, 3.5 additional jobs were created.

[i] Federal Reserve System: Beige Book: August 2026

[ii] Northern Virginia Technology Council, 2024 Data Center Biennial Report: April 2024